It's been a while since I had anything to post about the rpu project, been ironing out some bugs on the 27. Now that it seems to be running well I have been able to get back on the rpu.
The front frame sections were holding me back. I decided to taper them from 4 inches to 3 inches in the front so I had to cut a pie shaped section 1 inch wide by 3 feet long and then close it up. I got it cut and have been hesitating to have my Son Dan weld it up for me because I didn't want him to miss any time working on his own car. But this week I clamped the front section to the welding table and he got them done for me. I don't weld well enough to do structural stuff, so I leave that to him.
After they were welded I ground the welds smooth and then cut the sections of the frame that go from the firewall to the back of the body. Tonight we got those pieces welded to the front frame sections, and I was able to finally slip that much of the frame under the body and start squaring things up.
I also cut all the pieces of tubing that go in the bed area, and tomorrow Dan will weld those up also. Our plan is to do both sides of the frame then drag out the frame jig and weld crossmembers in, front and rear.
Here are some pictures of what we got done today. It's 3 am and we just got in from the shop, and I am going to bed. :D
Don