got rid of the mustang, it leaves next week and bought a pille of tubing the dragster will begin construction in march. picking up rearend here in a few days going 8 3/4 gonna drop the old nova motor in it, with aluminum heads and i want to do stacks, but i may go with a tunnelram and hat. then i can use the hat later when i do a blower motor