Originally Posted by jerry clayton
I charge $120 hour for welding up stainless systems and I think we are probably losing money on it--I have to figure in the costs of much more than my time---stainless rod, argon gas for the torch and to feed inside to purge the tube, plugs and pieces for the purge system, bandsaw blades that are between $50-60, sanding belts, some material thats not part of the tube and bends, etc, etc
I see many jobs that were done low buck that the owner was never happy with, some that rattle and bang, some that are in the way of something else( brakes, fuel lines,oil filters, etc
On a side note---I have discovered that the late model Mustang(up to 04) muffler and tail pipe will fit up over an axle, around a coilover and line up down the frame rail clearing a fuel tank on 32-34 fords--you got to shorten the tip but works fine and there are many cat back packages that will give you muffs and pipes--good hanger system also
Jerry