Well we're in the home stretch!
Over the course of the summer, we got all the necessary foundation work done, erected the steel and installed the precast concrete planks for the upper level floor. The elevator shaft is in and the mechanicals start getting installed next week.
The upper level "residence" is all roughed in. We have windows, doors and they finished the roof today. The rough plumbing is done and the rough heating and electric should be done in a couple of weeks. For the most part the front of the building is done: ie doors, masonry, electric etc.
We're presently working on the lower level garage for the daily drivers, a home office and a rec room. We salvaged a really kool 100 year old bar from a tavern across the street to be incorporated in the rec room attached to the showroom.
Insulation, drywall then finish electric, heating, plumbing, heating and carpentry are next.
We had hoped to be in by year end however Feb looks more realistic.
All in all the project has gone rather nicely. It's been a pleasure working with contractors who share our vision and are willing to be flexible as changes are required ( as in most renoavtion projects).
Our project was submitted and tentatively accepted by HGTV for one of their programs. Stay tuned!
PS. Of course ALL car related activities have been put on hold...hopefully next summer we will have time to play!
By the way, did anybody attend the the Goodguys Great Lakes Nationals hosted right here in beautiful Waukesha, WI?