02-21-2015 08:17 PM #1
Today Kyle finished up another loose end, tying in the bottom of the NOS quarter panel.. A bit of hammer bumping to get the panels aligned...
Plug weld holes drilled and filled.....
Then he turned his attention to duplicating a second half for the front divider panel for the rear seat.
Using the Erco kick shrinker....
Needs a bit of fine tuning still but he's getting there...
And I was making progress on more blocking of the front end body parts, at least until an emergency phone call from one of our tenants indicated some water pipe issues from the recent low temps... This is what I was greeted with....
The hole to the left is where the plumber had put the pipe through, right against the outside wall. Then the brainiac insulators failed to caulk, and then put insulation over TOP of the pipes, keeping them well acclimated to any outside temps. I cut some access holes in the wall and relocated the one pipe farther away from the outer wall board where insulation could go between the pipe and the wall, as it should have been done from the get go.
And here's the culprit...
I'll let things dry out overnight, and finish tomorrow with adding a bit of caulk and insulation. Drywall/painter due in early this week to close things up..Last edited by MP&C; 02-21-2015 at 08:21 PM.
Robert