Thread: 55 Wagon Progress
Results 1 to 15 of 1865
Threaded View
-
03-20-2017 03:49 AM #11
Haha! Winding down on the bus work so we can get back to some 55 seats..
All ready to spray...
Here's the SPI epoxy sprayed on the repair area...
as well as on our bolting plate we fabricated. This will be riveted behind the panel using stainless pop rivets..
First coat of BASF Urethane, and a shot of the scaffolding setup used...
Final coat...
https://www.youtube.com/watch?v=AiYA19ELpj8
Unmasked, we'll let this set a bit and get it re-assembled on Tuesday night.
Robert
Several years ago we did quite a good trip of USA, and on our trip we got to meet Mike and Christine Frade. We didn't stay long with them, but in that relatively short time we both gained a great...
We Lost a Good One