Thread: 55 Wagon Progress
Results 1 to 15 of 1865
Threaded View
-
05-27-2017 08:33 PM #11
Pilot hole drilled for the passenger B-Pillar.....
The center point is spring loaded, but they seem to locate better using a pilot hole vs. just a punch...
The plug weld holes drilled for the anchor and paint cleaned off in prep for welding..
Apprentice E worked on smoothing off the plug welds from last week..
Welding in the anchor .....
For the lower anchor point, which will hold both the retractor and the lap belt, we used some 14 ga that will be plug welded to the back side of the inner quarter panel just behind the B Pillar.. A 1/2" lock nut is welded to the back side, and a spacer added to the front side to keep the lap belt off the side wall.
Or the motion picture version....
https://www.youtube.com/watch?v=4na-...ature=youtu.beRobert
Several years ago we did quite a good trip of USA, and on our trip we got to meet Mike and Christine Frade. We didn't stay long with them, but in that relatively short time we both gained a great...
We Lost a Good One