Thanks for the comments!


More work on the lid...










Lid hangs over slightly in the front to serve as our only pull/lift for opening the lid, nice and tidy. It will be held closed using rare earth magnets.







Video version:



https://www.youtube.com/watch?v=e3cAFzk8Zfc



Our kick panels for the rear seat also need some support against the inner quarter panel to help hold the arm rest.







Jake bent up a 1 x 1 angle out of 19 gauge and used the Erco to match the contour of the kick panel. In order to not block off the window mechanism access panel, we'll bolt it to that panel.. As we have yet to install all of our interior/carpet/upholstery, we made the support adjustable so we can match the kick panel height at installation.. Video version:



https://www.youtube.com/watch?v=wicUAwkqvAI







More details on the console, we had hemmed all the edges to help protect the upholstery when it gets wrapped, but the tunnel cutout at the rear still needed an "added" hem. Then our hem is tacked in place, edges adjusted with a drum sander, and the two edges fusion welded together using the TIG.











....and sanded smooth..







Next, layout and folding the insert for the console. Some parts needed to fill in voids will be added later..
















Test fit....







Video:



https://www.youtube.com/watch?v=J20U5oIL8vw