Well after about 12 years, the Lennox TE150 is leaving the building. When we did the 35 Chevy louvers for Cody Walls, it hinted then of it's limitations. Simply put, not enough throat capacity with some of the automotive panels.


I bought this from Northwest Airlines and picked it up from their then recently closed DC-9 maintenance facility at the Hartsfield Atlanta airport. They had shut down the operation and moved maintenance overseas. This and a 100 ton drop press was the last that remained in an otherwise vacant building.


I've found another metalshaper that has a larger machine, but doesn't really use it for the capacity. So after negotiating the terms, he will be using this for the (mainly) motorcycle fabrications, where I will have more capacity for larger automotive panels.