Welcome to Club Hot Rod!  The premier site for everything to do with Hot Rod, Customs, Low Riders, Rat Rods, and more. 

  •  » Members from all over the US and the world!
  •  » Help from all over the world for your questions
  •  » Build logs for you and all members
  •  » Blogs
  •  » Image Gallery
  •  » Many thousands of members and hundreds of thousands of posts! 

YES! I want to register an account for free right now!  p.s.: For registered members this ad will NOT show

 

Thread: Streetwerkz 30 sedan build
          
   
   

Results 1 to 15 of 86

Threaded View

  1. #30
    STREETWERKZ's Avatar
    STREETWERKZ is offline CHR Member/Contributor Visit my Photo Gallery
    Join Date
    Jan 2009
    Location
    Columbus
    Posts
    180

    I got a little more done today, funny how long it takes to do a "simple task"
    So far in boxing the sub rails, and running my wire chase I have around 10 hours in both sides, and another 2-3 to go befor it's complete.

    Once complete I can FINALLY get the body back on and start with all the sheet metal that's actually seen

    drivers side underneath boxing plate. As you can tell I goofed a little with my wire run, and had to form a channel in the plate

    preliminary finishing for wire run.
    I still need to do some finish sanding

    Passenger side boxed, tacked and ready for final welding and sanding

    Drivers side sub rail with wire run in it
    Attached Images
    Custom Powder Coating & Media Blasting

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
Links monetized by VigLink