Thread: Bad Ast Astro Van Build
Results 1 to 15 of 589
Threaded View
-
01-09-2012 03:45 AM #11
This series was done over New Years weekend.
What with my 34th wedding anniversary and New Years Eve being the same night I killed two birds with one stone, so to speak.
We had a party Saturday and another on Sunday but I got a few hours in each day along with helping to clean and set stuff up.
Actually got a lot done. The doghouse removable panels are done, both sides. Everything is bolted up and fits very well so I am happy. Having these panels removable makes for easy working clearances around the plugs and headers.
http://images44.fotki.com/v220/photo...MVC018F-vi.jpg
http://images59.fotki.com/v255/photo...MVC019F-vi.jpg
http://images51.fotki.com/v628/photo...MVC020F-vi.jpg
I still have to finish up a short flange for the rear part of the floor but that is easy and I'll get that wrapped up this afternoon.If money is the root of all evil... Women must be the fertilizer...
Link to my BAD AST Build Thread:
http://www.clubhotrod.com/suspension...van-build.html
RIP Mike....prayers to those you left behind. .
We Lost a Good One